Docs
Open Moduvio
Module

Engineering

Govern requirements, controlled design records, recursive product structures, baselines and engineering change across the product lifecycle.

Available now

Available now for governed product configuration and Engineering BOM / PLM release. Native CAD authoring remains outside Moduvio.

What this module does

Engineering establishes the governed as-designed context from traced requirements and controlled design data through an independently released PLM handoff, without creating or moving stock.

Primary roles

Product Engineer, Quality Engineer and Configuration Manager, with read-only participation from Manufacturing, Quality and audit roles.

Inventory meaning

None. Product definitions, baselines and design releases describe the as-designed product and never create or move stock.

Capabilities

Product hierarchy

Site-scoped product families, models and variants distinct from the stock catalogue.

Configuration items

Hardware, software, firmware, document and interface references to approved source records.

Released baselines

Immutable configuration snapshots with date, serial-range or all-unit effectivity and independent release.

Product-unit comparison

Serialized end-product context with read-only as-designed versus captured as-built comparison.

Integrated PLM release

Traced requirements/V&V, controlled CAD/PDM records, recursive EBOM, ECR/ECO impact and exact Manufacturing handoff.

Inputs, outputs and handoffs

Receives

Approved catalogue revisions, released BOMs, CLEAN controlled design evidence and product/customer requirements.

Produces

Released product baselines, controlled configuration items, traced PLM packages, recursive EBOM evidence and an exact Manufacturing handoff.

Handoff

Manufacturing can translate only the exact current released PLM source into an MBOM; it cannot rewrite Engineering's baseline or EBOM.

Where to work

Authority boundary

What does and does not change

None. Product definitions, baselines and design releases describe the as-designed product and never create or move stock. Manufacturing can translate only the exact current released PLM source into an MBOM; it cannot rewrite Engineering's baseline or EBOM.

Continue learning

Documentation version 2026.09

Last reviewed August 2026