Flow 37 — Released visual work instruction to attributable operation observation
Attach an immutable ordered visual package to one exact released manufacturing plan or operation, independently release it, pin the active version into a fresh dispatch, and require acknowledgements, controlled evidence and Quality hold acceptance before the existing operation execution may be recorded.
Overview
Flow 37 creates definition, dispatch-requirement, observation and hold-review evidence only. It never changes receipts, quarantine, inspection, custody, Assembly, current stock, stock ledger, source configuration, machine/safety state, notification delivery or generic workflow definitions.
Manufacturing Engineer author → different Production Manager releaser → Production Planner pins through the existing dispatch → exact named Production Operator observer → different Quality Inspector hold reviewer → Auditor read-only
Process
- 1Bind exact target
Select only the current released plan version and optionally one exact copied operation.
Released source read-only - 2Author visual steps
Order inert text with CLEAN immutable image, video or drawing versions, acknowledgements and explicit holds.
Controlled definition only - 3Independent release
A different Production Manager accepts or rejects one immutable SHA-256 definition.
No execution/custody action - 4Pin at dispatch
A fresh existing readiness dispatch freezes the then-active plan-start and exact-operation versions.
Dispatch requirement only - 5Observe and hold
The exact named operator records steps in order; a different Quality Inspector clears declared holds.
Evidence gate only - 6Execute existing operationREAD ONLY
Only a complete pinned run unlocks the established Flow 27/28 operation evidence endpoint.
No second execution engine
Role handoff
Manufacturing Engineer author → different Production Manager releaser → Production Planner pins through the existing dispatch → exact named Production Operator observer → different Quality Inspector hold reviewer → Auditor read-only
Detailed reference chapters
Detailed steps
- 1
Open Manufacturing → Visual work instructions and select one exact current released manufacturing-plan version, optionally narrowing the target to one operation.
- 2
Create ordered steps with concise inert instruction text, an observation prompt, at least one same-site CLEAN PHOTO, VIDEO or DRAWING version per step, acknowledgement requirements, optional controlled execution evidence and explicit Quality holds.
- 3
Submit as the version author. As a different Production Manager, reject v1, retain it, create replacement v2 and release only the unchanged exact plan-source and definition fingerprints.
- 4
Create a fresh operation dispatch through Production readiness. Confirm it pins the active package version; later package replacement does not rewrite that dispatch, while a later fresh dispatch pins the new active version.
- 5
As the exact named Production Operator, preview media only through authenticated controlled-document download and record each step in released order. Stop at every Quality hold and attach evidence where required.
- 6
As a different Quality Inspector, accept the pending hold to continue or reject the run so the operation cannot execute. Complete all pinned runs, then record the existing manufacturing operation and reconcile zero source/custody/stock/machine/workflow side effects.
Field-by-field practice data
Release a two-step visual instruction package for one exact training operation and complete its pinned acknowledgement and Quality hold. The page shows sample set A; the workbook includes independent A, B and C values.
Field names match the current application labels. Select existing approved records where shown, leave optional values blank unless they genuinely apply, and never copy fictitious TRAIN values into live work.
Author the visual package
Select the exact current released plan operation, add ordered inert steps and attach CLEAN immutable visual media before independent release.
| Exact field name | Requirement | Sample value A | How to use it |
|---|---|---|---|
| Exact released manufacturing plan | Select existing | TRAIN-A-MPL-001 v2 | Select only the exact current RELEASED/APPROVED version. |
| Attachment scope | Select existing | 20 · MECH_ASSEMBLY | Select the operation copied into that released plan. |
| Package title | Required | TRAIN-A actuator connector visual instruction | Use a unique factual controlled title. |
| Controlled purpose | Required | Guide connector orientation and seating using released visual evidence and an independent Quality hold. | State the bounded human-guidance purpose; do not add commands or URLs. |
| Step code | Required | ORIENT_CONNECTOR | Use a unique stable code. |
| Released instruction | Required | Align the keyed face with the released image before inserting the connector by hand. | Use concise inert text. |
| Controlled media version | Select existing | TRAIN-A-PHOTO-ORIENT v1 | Select one CLEAN PHOTO JPEG/PNG/WebP version. |
| Acknowledgement requirement | Required | Required | Require explicit operator acknowledgement. |
| Step code | Required | VERIFY_SEATING | Use the next unique ordered code. |
| Controlled media version | Select existing | TRAIN-A-DRAW-SEAT v1 | Select one CLEAN DRAWING PDF/image version. |
| Hold point | Required | QUALITY | Stop until a different Quality Inspector decides. |
| Execution evidence requirement | Required | Required | Require an exact CLEAN observation evidence version. |
| Package-definition evidence | Select existing | TRAIN-A-MWI-EVID-001 | Select CLEAN same-site evidence. |
Expected result: The definition is versioned and fingerprinted; it creates no dispatch, operation execution, machine command, stock or custody transaction.
Observe the pinned run
After Planning and Supervisor release create the fresh dispatch, open each pinned step in order and record attributable facts.
| Exact field name | Requirement | Sample value A | How to use it |
|---|---|---|---|
| Dispatch | Select existing | TRAIN-A-MDP-020 | Use the exact RELEASED dispatch assigned to the signed-in operator. |
| Acknowledgement requirement | Required | Yes | Acknowledge only after reviewing the exact media. |
| Attributable note | Required | Keyed face aligns with the released orientation image. | Record only what was observed. |
| Attributable note | Required | Connector is fully seated and witness mark is visible. | Record the objective condition. |
| Required execution evidence | Select existing | TRAIN-A-OBS-SEAT-001 | Attach required CLEAN evidence. |
| Decision | Required | ACCEPT | A different Quality Inspector makes the evidence-backed decision. |
| Controlled transition evidence | Select existing | TRAIN-A-HOLD-SEAT-001 | Attach exact review evidence. |
Expected result: The run must COMPLETE before the existing Build control operation can be recorded; rejection keeps it blocked.
End state
One completed dispatch retains exact released visual-definition lineage, ordered attributable observations and independent hold evidence as a subordinate gate to the existing operation execution without adding another workflow, transaction or control engine.