Docs
Open Moduvio
Screen reference · Engineering

Engineering BOM and PLM release

Build the governed Requirements → CAD/PDM → EBOM → ECR/ECO → Manufacturing handoff thread. Each section retains exact source evidence and maker-checker decisions.

Screen orientation

Who can use it

Engineering authoring, configuration release and Quality verification are independently permissioned. Controlled sources are filtered by tenant/site/classification scope.

How the screen is arranged

The numbered sections reflect the intended order. Open a section to create or revise a record, then use its action panel to submit, decide or release the exact version.

Field reference

The entries below describe the current screen controls and read-only values. They do not relax server-side validation, site scope, classification handling or required independence in a governed decision.

Field or valueControlRequired or shown whenHow to use or read itResult
Requirement ID / Requirement statementTextRequired to create a requirement.Use the controlled requirement identity and a clear verifiable statement. Do not use a document title in place of the requirement.Creates a traceable design input.
Verification method / Acceptance criteriaTextRequired when defining requirement verification.State how compliance will be proven and the measurable/pass condition before release.Makes the requirement’s V&V expectation explicit.
Design record / Record typeControlled document select and selectRequired for CAD/PDM evidence.Select the exact CLEAN controlled design version and classify its record type; do not upload an uncontrolled duplicate into this workflow.Pins the design evidence in the PLM thread.
ECR number / Problem statementTextRequired to open an engineering change request.Use the controlled change identifier and describe the reason/defect without claiming a decision has already been made.Creates the reviewable change request context.
ECO number / Impact summaryTextRequired when authoring an engineering change order.State the approved implementation intent and cross-record impact. Use the specified effective date where required.Creates controlled change execution evidence.
Released product sourceSelectRequired for Manufacturing handoff.Select the exact released product/baseline source after all prerequisite PLM releases are complete.Creates a pinned handoff source for Manufacturing; it cannot be edited by the receiving module.
Attributable note / DecisionLong text and selectRequired for submit/review/release transitions.Record the specific rationale and select the authorised decision. The original author cannot perform a required independent decision.Adds immutable workflow evidence to the exact version.

Actions and effects

Create or revise

When to use: When an engineering artefact needs controlled authoring or correction.
What it does: Creates a new version and preserves earlier released/draft evidence.

Submit / decide

When to use: At the record’s current governed state.
What it does: Records attributable progression or independent approval/rejection; it does not change inventory.

Release Manufacturing handoff

When to use: Only after the exact PLM evidence is released.
What it does: Publishes the immutable source that Manufacturing may translate into an MBOM.

Lists and states

  • Section registers show revision, source/evidence, status and author/decision attribution for each stage of the digital thread.
  • EBOM lines express the as-designed structure; they are not a pick list or stock reservation.

Authority boundary

PLM releases as-designed authority. It does not create an MBOM, command a shop floor, issue material, post stock or make an independent Quality disposition.

Documentation version 2026.09

Last reviewed August 2026