Screen reference · Manufacturing

Capacity and cost evidence

Govern exact-resource calendars and evidence-rate versions, inspect finite dispatch loads and read immutable operation cost evidence.

Screen orientation

Who can use it

Manufacturing capacity permissions, site and clearance apply. Manufacturing Engineer authors; a different Production Manager approves. Dispatch load and cost evidence are generated by their owning operations.

How the screen is arranged

Calendar and rate-card definition panels feed immutable registers. Read-only load and cost sections explain reservations, consumption and per-operation evidence.

Field reference

The entries below describe the current screen controls and read-only values. They do not relax server-side validation, site scope, classification handling or required independence in a governed decision.

Field or valueControlRequired or shown whenHow to use or read itResult
Exact approved resource · IANA timezone · Valid from · Valid toCalendar headerRequired.Pin one approved resource and bounded local-time calendar.Scopes the calendar version.
Day · Local start · Local end · Capacity unitsInterval controlsAt least one valid interval is required.Define non-overlapping bounded weekly capacity.Creates the finite availability model.
Definition noteLong textRequired.Explain calendar purpose and exceptions.Becomes immutable definition evidence.
Site · Code · Currency · NameRate-card headerRequired.Create one site/currency evidence-rate identity.Scopes rate selection.
Labour / minute · Work centre / minute · Tooling / minuteDecimal ratesRequired as applicable.Record evidence rates with exact decimal values.Freezes the derivation inputs.
Valid from · Valid to · Evidence-rate noteValidity fieldsRequired as applicable.Bound and explain the rate version.Controls future dispatch eligibility.
Controlled capacity evidenceControlled evidenceRequired.Select CLEAN definition evidence.Pins the authored version.
Decision · Attributable note · Controlled transition evidenceReview controlsRequired.A different Production Manager records the outcome with CLEAN evidence.Releases/rejects the exact version.
Finite dispatch loadRead-only tableDerived.Read planned/reserved/consumed/cancelled loads by exact resource/version.Explains capacity use.
Immutable operation cost evidenceRead-only tableDerived at execution.Read minutes, rates, WIP and fingerprints; do not treat them as financial postings.Explains operation evidence cost.

Actions and effects

Create calendar / rate version

When to use: When controlled availability or evidence rates change.
What it does: Creates an immutable draft/successor.

Approve or reject

When to use: By a different Production Manager.
What it does: Controls future selection without rewriting pinned dispatches.

Inspect loads and cost evidence

When to use: For authorised Manufacturing evidence review.
What it does: Reads generated immutable facts and performs no transaction.

Lists and states

  • Calendar, rate, load and cost register: use status, exact version and accountable actors to distinguish current work from retained history.
  • History and evidence: hashes and source/version references identify the immutable facts used by each decision.

Authority boundary

This surface governs planning/evidence inputs. It performs no maintenance, machine control, payroll, GL, invoice, payment, inventory valuation, stock or custody posting.

Documentation version 2026.09

Last reviewed August 2026