Flow 24 — Reusable inspection/test plans and assurance analytics
Approve immutable reusable characteristic plans against an exact item revision and optional supplier, then freeze and independently review deterministic receipt-inspection, FAI and NCR analytics without manually selecting sources.
Overview
Flow 24 governs planning and read-only analysis evidence. It never starts or dispositions an inspection, records FAI results, creates/changes an NCR, changes an item or supplier, moves stock, creates a notification delivery or sends a message.
Quality Engineer plan author → different QA Head plan approver → different Quality Audit Manager exact-source analyst → different QA Head analytics reviewer → Quality Inspector / Product Engineer / Quality Management Representative / Auditor read-only
Process
- 1Exact plan scope
Freeze approved item revision, optional supplier, sampling rule and complete characteristics.
Immutable plan v1 - 2Independent plan gate
Reject v1 or approve a fresh unchanged subject fingerprint.
No inspection started - 3Reusable active plan
Activate one approved version while preserving rejected/superseded history.
Planning authority only - 4Exact-source analysis
System-select every matching disposed inspection, final FAI and item NCR in period.
Read-only source snapshots - 5Independent analytics gateREAD ONLY
Recalculate fingerprint and approve or reject the immutable analysis.
Sources and custody unchanged
Role handoff
Quality Engineer plan author → different QA Head plan approver → different Quality Audit Manager exact-source analyst → different QA Head analytics reviewer → Quality Inspector / Product Engineer / Quality Management Representative / Auditor read-only
Detailed reference chapters
Detailed steps
- 1
As Quality Engineer, open Quality → Assurance plans and create v1 against one exact approved active item revision, one site and optionally one active AVL-approved supplier. Define the reusable plan type, sampling strategy, acceptance rule, equipment/competency requirements and every numbered characteristic with criticality, requirement, acceptance criteria, method and recording type.
- 2
Submit v1. As a different QA Head, reject it and confirm v1 remains immutable. Create replacement v2; approval recalculates the governed site/item/supplier fingerprint and blocks if the item revision or approval facts changed.
- 3
As a different Quality Audit Manager, select the active plan and a bounded period. Moduvio freezes every matching disposed receipt inspection, final FAI decision and item NCR; no manual source picker or substitution is available. Review the deterministic QUALITY_ASSURANCE_V1 scores and source register.
- 4
Change one disposable source outcome and confirm a different QA Head cannot approve the stale analysis. Restore the source or generate a fresh immutable analysis, then approve only an exact fingerprint match.
- 5
As Auditor, reconcile plan/version/characteristic/review and analysis/source/review histories, CLEAN evidence, audit/outbox facts and unchanged item, supplier, inspection, FAI, NCR, stock/ledger and notification-delivery witnesses.
Field-by-field practice data
Create a reusable incoming-inspection plan for the training bolt. The page shows sample set A; the workbook includes independent A, B and C values.
Field names match the current application labels. Select existing approved records where shown, leave optional values blank unless they genuinely apply, and never copy fictitious TRAIN values into live work.
Create the assurance plan
Select the exact item/supplier context and define sampling plus characteristic criteria.
| Exact field name | Requirement | Sample value A | How to use it |
|---|---|---|---|
| Site | Select existing | COM-01 | Select the plan site. |
| Approved item revision | Select existing | TRAIN-A-BOLT-M8 rev A | Select the exact approved item revision. |
| Optional approved supplier | Optional | TRAIN-A-SUPPLIER | Use only when supplier-specific. |
| Plan type | Required | INCOMING_INSPECTION | Choose the applicable assurance use. |
| Classification | Required | RESTRICTED | Match evidence and source. |
| Title | Required | TRAIN-A bolt incoming-inspection plan | Use a clear controlled title. |
| Sampling strategy | Required | FIXED_SAMPLE | Use the approved statistical/operational strategy. |
| Sample size | Required | 2 | Enter the approved representative sample. |
| Acceptance rule | Required | Zero critical defects; all dimensions within TRN-DWG-01. | State deterministic acceptance criteria. |
| Equipment requirements | Required | Calibrated thread gauge and micrometer. | Name governed equipment requirements. |
| Competency requirements | Required | Qualified incoming Quality Inspector. | Name required competence. |
Expected result: A different QA Head approves the reusable version; no receipt or source Quality record changes.
End state
One active reusable plan retains rejected and approved immutable characteristic versions, while one approved analysis retains the deterministic exact source population and separate QA decision without acquiring inspection, FAI, NCR, item, supplier, custody or messaging authority.