Tutorial: Reconcile approved job and contract operational cost

Read one approved build rollup from exact job and operation evidence through deterministic customer/contract demand context without allocating cost or posting finance.

Learning goal

Audience

Project / Contract Managers, Accountable Executives, Production Managers/Planners and auditors.

Goal

Complete Flow 41 and prove that a useful actual-versus-baseline view can remain a permission-scoped read model with explicit ambiguity and zero operational/financial authority.

Before you begin

  • Use an authorised disposable training tenant
  • One exact product-baseline build has complete Flow 29 evidence and an approved Flow 30 rollup
  • The Assembly work order carries the training project reference
  • Zero, one or two visible Flow 40 demand lines can be prepared for association tests
  • The reader has programme_cost:read, assigned-site scope and sufficient clearance
Use safe learning data

Observation-first is the default. Do not create retained customer, procurement, receipt, inventory, Quality, Engineering or Manufacturing records merely to complete a tutorial.

Guided journey

  1. 1
    Manufacturing

    Verify the approved source version

    Open /manufacturing/cost-rollups
    Acting role
    Production Planner / different Production Manager
    What to do
    Open the approved current rollup and record its UUID/version, build, plan, exact released baseline, currency and SHA-256 source fingerprint.
    What you should observe
    Draft, submitted and rejected versions are not eligible for Programme insight.
    May change

    Nothing during the read; the approved source already exists from Flow 30.

    Must remain unchanged

    Operation attempts, rate versions, plan, build, WIP evidence, stock and finance remain unchanged.

  2. 2
    Programme

    Open the scoped programme view

    Open /programme/cost-insights
    Acting role
    Project / Contract Manager
    What to do
    Filter by exact job/work order, project, customer or contract and compare the returned job/baseline/rollup IDs with the approved source.
    What you should observe
    Only assigned-site and clearance-visible approved rows appear; a user without programme_cost:read receives permission denial.
    May change

    A classified-read audit fact only where applicable.

    Must remain unchanged

    No outbox or domain record is created.

  3. 3
    Programme

    Interpret actual versus baseline

    Open /programme/cost-insights
    Acting role
    Production Manager / Planner
    What to do
    Read planned and actual minutes/cost plus variance by currency; do not interpret operation-evidence WIP as current stock or inventory valuation.
    What you should observe
    Unlike currencies stay separated and values come from the immutable rollup rather than Item Master.
    May change

    Nothing.

    Must remain unchanged

    Payroll, budget, GL, AP/AR, tax, payment and valuation remain outside the view.

  4. 4
    Programme

    Prove unique demand context

    Open /programme/cost-insights
    Acting role
    Project / Contract Manager
    What to do
    With exactly one visible same-site demand using the same project and exact baseline, verify customer, contract, order, quantity and date appear as EXACT UNIQUE MATCH.
    What you should observe
    The match rule is visible and no manufacturing or customer record gains a new link or allocation.
    May change

    Classified-read audit only.

    Must remain unchanged

    Demand and build remain independent source records.

  5. 5
    Programme

    Prove ambiguity fails honest

    Open /programme/cost-insights
    Acting role
    Project / Contract Manager
    What to do
    Add or inspect a second matching demand in the disposable fixture and refresh the view.
    What you should observe
    The build becomes AMBIGUOUS, candidates remain visible and cost is not split, duplicated or assigned to either contract.
    May change

    Nothing from the cost-insight read.

    Must remain unchanged

    Approved cost totals and both demand lines retain their original truth.

  6. 6
    Programme / Manufacturing / Governance

    Drill and reconcile isolation

    Open /programme/cost-insights
    Acting role
    Auditor
    What to do
    Expand operations and reconcile attempt, execution, dispatch, exact rate-version and fingerprint lineage, then compare zero-side-effect witnesses.
    What you should observe
    Every source remains attributable and immutable; only expected classified-read audit rows increase.
    May change

    Read audit only.

    Must remain unchanged

    Current stock, stock ledger, custody, identities, demand, Manufacturing sources, outbox and every financial witness remain unchanged.

Continue learning