Flow 22 — Deviation, concession and waiver governance

Govern temporary permission against exact approved design, NCR and MRB sources with independent technical, configuration, conditional contract/safety and final QA authority, then verify every bounded use before closure.

Overview

Inventory meaning

Flow 22 records permission and verified application evidence only. It never approves or revises a baseline, dispositions or moves stock, replaces MRB or inspection authority, creates an audit, or sends a customer/regulatory message.

Responsible roles

Quality Engineer → different QA Head scope reviewer → different Product Engineer → different Configuration Manager plus conditional Project/Contract and Product Safety Managers → different QA final authoriser → Quality Engineer application recorder → separate QA verifier/closer → Auditor read-only

Process

  1. 1
    Exact scope

    Freeze approved design, NCR/MRB, validity, effectivity and controls.

    Immutable permission draft
  2. 2
    QA scope gate

    Reject for replacement version or approve completeness independently.

    No design or stock authority
  3. 3
    Technical review

    Product Engineering decides bounded technical acceptability.

    Technical evidence only
  4. 4
    Authority concurrence

    Configuration plus declared contract and safety authorities decide.

    Exact source snapshots
  5. 5
    Final QA

    A separate QA user activates only the fully approved version.

    Permission active · custody unchanged
  6. 6
    Use and closure

    Record, verify and close every application independently.

    Read-only permission history
    READ ONLY

Role handoff

Quality Engineer → different QA Head scope reviewer → different Product Engineer → different Configuration Manager plus conditional Project/Contract and Product Safety Managers → different QA final authoriser → Quality Engineer application recorder → separate QA verifier/closer → Auditor read-only

Detailed reference chapters

Detailed steps

  1. 1

    As Quality Engineer, open Quality → Deviations & concessions and create scope v1 against one exact approved item revision, released product baseline or active configuration item. A concession requires one exact same-site/classification NCR; any material effect requires a matching approved MRB; a waiver requires contract/customer review and cannot carry material disposition authority.

  2. 2

    Submit v1. As a different QA Head, reject it and confirm it remains immutable. Create replacement v2, submit and independently approve scope completeness.

  3. 3

    As a distinct Product Engineer, approve the technical basis. As separate Configuration Manager, approve the exact source. Add separate Project/Contract Manager and Product Safety Manager concurrence only when v2 declared those authorities required.

  4. 4

    As a second QA Head distinct from the scope reviewer and all prior reviewers, record final authorisation. Confirm no role can skip an authority, self-review or authorise a rejected/incomplete version.

  5. 5

    As Quality Engineer, record each bounded use within validity against its exact configuration, MRB execution, work order or inspection record and CLEAN evidence. As a separate QA Head, independently verify or reject each application.

  6. 6

    Request closure only after at least one verified application and no pending verification. A separate QA Head may close acceptable/monitored residual risk but cannot approve unacceptable residual risk. Reconcile that configuration, inventory, ledger, audit and notification records did not change.

Field-by-field practice data

Use a disposable training tenant

Request a time-bounded training deviation against one exact released design source. The page shows sample set A; the workbook includes independent A, B and C values.

Download all workflow samples (.xlsx)

Field names match the current application labels. Select existing approved records where shown, leave optional values blank unless they genuinely apply, and never copy fictitious TRAIN values into live work.

1
Authorised Quality or Engineering role

Create the deviation request

Open /quality/deviations

Select the exact source and bound dates/quantity before independent decisions.

Exact field nameRequirementSample value AHow to use it
SiteSelect existingCOM-01Select the governed site.
Case typeRequiredDEVIATIONUse concession only for the approved use case.
ClassificationRequiredRESTRICTEDMatch the design and evidence.
TitleRequiredTRAIN-A temporary bolt finish deviationUse a factual bounded title.
Request reasonRequiredApproved supplier finish unavailable; equivalent controlled finish proposed for training evaluation.State the operational need without presuming approval.
Exact design source typeRequiredITEM_REVISIONSelect the applicable authoritative source type.
Approved/released sourceSelect existingTRAIN-A-BOLT-M8 rev ASelect the exact source.
Valid fromRequired2026-09-15Set the earliest allowed use.
Valid untilRequired2026-10-15Use a bounded end date.
Quantity limit (optional)Optional10Enter when the authority is quantity limited.

Expected result: Approval creates only the declared exception authority; application remains an exact attributable action.

End state

One closed temporary-permission case retains immutable source snapshots, rejected and authorised scope versions, separated technical/configuration/conditional authorities, independently verified applications and closure evidence without acquiring design-release, custody, MRB, inspection, audit or messaging authority.

Documentation version 2026.09

Last reviewed August 2026