Docs
Open Moduvio
Screen reference · Sustainment

Lifecycle operations

Operate the currently bounded sustainment foundation: recurring programme definitions, append-only usage readings, human-generated due work, existing exact-identity maintenance/disassembly and read-only as-maintained evidence.

Screen orientation

Who can use it

Maintenance visibility and actions reuse existing maintenance permissions plus tenant, assigned-site and classification filters. As-maintained detail is discoverable only through an authorised site anchor.

How the screen is arranged

Use the maintenance-programme, usage-meter, due-work and as-maintained sections independently. Each section exposes only the records and actions within its declared authority boundary.

Field reference

The entries below describe the current screen controls and read-only values. They do not relax server-side validation, site scope, classification handling or required independence in a governed decision.

Field or valueControlRequired or shown whenHow to use or read itResult
Managed instanceSelectRequired for programme, meter or evidence selection.Select the exact serialised managed identity. The as-maintained register displays it only when an authorised site-bound source exists.Sets the physical identity context; it does not infer installation/removal history.
Accountable siteSelectRequired for a programme.Choose the site that owns recurring programme evidence. It filters readers and eligible approval actions.Scopes the programme and generated work to the authorised site.
Calendar interval days / Usage intervalNumberAt least one approved trigger is required for a programme.Use the controlled calendar/usage threshold. Do not configure autonomous scheduling or predictive maintenance logic.Defines deterministic due criteria for the approved version.
Usage meter / Reading / Reading dateSelect, decimal and dateRequired to append a usage reading.Record the observed cumulative reading and its observed date. Readings are append-only and cannot decrease.Adds immutable usage evidence used by due evaluation.
Required task / Task instructionTextRequired for a programme version.State the exact governed task and approved instruction context; this is not a free-form work release.Pins the task template to the programme version.
Due programme / Scheduled date / Generation noteSelect, date and long textRequired when a permitted user deliberately generates work.Select the approved version and explain the human generation. The system does not autonomously release work.Creates an idempotent linked work-order occurrence through the existing authority.
Scope disclosure / Current catalogue revisionRead-onlyAlways read-only in as-maintained evidence.Use these values as present evidence context only. The displayed revision is not a historical as-installed configuration pin.Communicates what the screen can and cannot prove.

Actions and effects

Create / submit / approve programme

When to use: For a new controlled recurring definition, with independent approval.
What it does: Creates a versioned programme; it does not schedule, reserve spares or post stock.

Record usage reading

When to use: When an eligible operator has observed the physical meter.
What it does: Appends immutable cumulative evidence; it does not generate work automatically.

Generate due work

When to use: Only after a permitted user deliberately confirms an approved due programme.
What it does: Creates controlled due work through the existing work-order authority.

Open as-maintained evidence

When to use: When an eligible site anchor is visible.
What it does: Reads scoped current/history evidence with no audit/outbox or business mutation side effect.

Lists and states

  • Programme versions: status, triggers, site and independent decision distinguish an available version from a draft.
  • As-maintained evidence: present state and separately scoped source sections must not be read as a complete installation/removal ledger.

Authority boundary

The screen has no background scheduler, telematics ingestion, predictive claim, automatic work release, spares reservation, repair/overhaul, life-limit, finance or external-delivery authority.

Documentation version 2026.09

Last reviewed August 2026